March 2020 issue of Fire Engineering

FE Volume 173 Issue 3

Check out the March 2020 issue of Fire Engineering, with features including Alex Degnan on hydraulic ventilation, and much more.

News in Brief: March 2020

Read some fire department news from the March 2020 issue of Fire Engineering.

Extending the Tower Ladder’s Reach

In the case of coming up short with a tower ladder, there is an evolution that firefighters should drill on so they can increase the reach of their tower ladders by using a portable ladder from the bucket for access, removal, or rescue.
Firefighter on a roof with flames venting

Venting for Fire, Venting for Life

Venting for fire and venting for life are planned and rehearsed procedures that allow the release of smoke and heat from the building.
Frank Viscuso

Inspiration vs. Intimidation: Which Type of Leader Will You Be?

People should follow you not because they “have” to but because they “want” to. Be the type of leader you always wanted to work for, says Frank Viscuso.
Firefighters perform roof ventilation at a Chicago fire

Truck Company Operations Without the Truck

Just because there is no ladder truck on scene does not mean truck work is not performed.
Firefighter throwing books

Letters to the Editor: March 2020

Read some letters to the editor regarding mandated technology and PTSD, and view a new illustration from Paul Combs.