USFA Coffee Break Training: Large Opening Protection

USFA Coffee Break Training: Large Opening Protection

Learning Objective: The student shall be able to describe the requirements for sprinkler protection around large vertical openings.

How should sprinklers be installed to protect large openings between floors in sprinkler equipped buildings?

Today’s training vignette, “Large Opening Protection” explains the installation techniques to minimize the chance of vertical fire spread.

Coffee Break Training provides an overview of fire protection topics and does not include all details, requirements or exceptions to the topics that are described. Always refer to nationally recognized design and installation codes and standards, the product manufacturer, or listing details for specific information.

Interpretations of codes and standards are the responsibility of the code official or authority having jurisdiction.

Download Your Coffee Break Training (PDF) HERE

Please share this Coffee Break Training segment and others with your peers.

Previous Coffee Breaks may be found on the USFA website.

Hand entrapped in rope gripper

Elevator Rescue: Rope Gripper Entrapment

Mike Dragonetti discusses operating safely while around a Rope Gripper and two methods of mitigating an entrapment situation.
Delta explosion

Two Workers Killed, Another Injured in Explosion at Atlanta Delta Air Lines Facility

Two workers were killed and another seriously injured in an explosion Tuesday at a Delta Air Lines maintenance facility near the Atlanta airport.