Preplanning Steps for Your Next Large Building Response

When automatic sprinkler systems were developed in the latter half of the 19th century, around the time of the Industrial Revolution, their focus was primarily to protect the structures that were built of wood. The manufacturing occupancies and low storage heights (most were stacked by hand) resulted in fires that were easily controlled by the pipe schedule sprinkler systems of that era. Much like when we speak of the evolving fire environment in modern residential structures, the fire environment in manufacturing and warehousing occupancies has also evolved to where the combustibility has increased considerably and storage heights have increased exponentially. The former natural materials are now synthetic (hydrocarbon-based), and storage heights of 50 to 100 feet are now being achieved. In combination, these two factors now create fires that are very challenging to suppress.

The design of fixed fire suppression systems has also evolved. The former standard sprinkler (with a ½-inch orifice) was designed to optimally deliver 15 to 20 gallons per minute (gpm). These did a good job of protecting low-piled storage and light manufacturing. Even today, millions of these sprinklers are still being installed in hotels, hospitals, schools, and other lighter-hazard occupancies.

RELATED FIREFIGHTER TRAINING

Video: John Norman on Residential Fire Sprinklers

Sprinklers and Firefighting

Sprinklers Made Simple

To address the higher challenge of the synthetic commodities and increased storage heights in warehousing, new sprinklers were developed in the latter half of the 20th cenpreintury. These sprinklers are designed to deliver 150 to 250 gpm per head. The high flow rates from these heads are designed to penetrate a vertical fire plume and suppress a fire rather than simply control it. The development of quick-response fusible link technology was key in achieving early application of water to result in suppression.

A full-fledged fire in a high-challenge occupancy may well be a once-in-a-career event for a fire service member. There is little opportunity to learn from experience; a mistake in fireground tactics at a fire in a 1,000,000-square-foot warehouse that results in destruction can be very costly not only in dollars but in lost jobs, tax base, and so on. If you have such high-challenge buildings in your response district, do you have a game plan in place to help ensure a positive outcome?

Understanding Fire Behavior

Consider a high-rack storage warehouse. These have become commonplace in most areas of the country and have common design features such as high roof heights, windowless walls, and limited fire subdivisions. Now consider how a fire develops in a building and how the fire protection system responds to it. A fire will typically begin at floor level and rapidly spread up the vertical rack face, reaching the roof level in less than one minute. Shortly after the flames start hitting the underside of the roof deck, the first automatic sprinkler operates, followed by an additional three to four sprinklers within the next minute. The flames, smoke, and water are now being driven downward through the rack and the aisle to floor level. Visibility in the fire area is being obstructed by the smoke. An orderly evacuation of the building is underway, as smoke has not yet enveloped the building. The sprinkler system continues to operate and drive the flames, smoke, and water down to the base of the rack. This fire is being suppressed, damage to the property is being minimized, and the hazard to the life safety of the occupants is being minimized.

Response of the Fire Protection System

The first sprinkler will open over the fire about one minute after the fire ignites. Flow from this sprinkler will cause the site fire pump to start automatically. The flow alarm on the sprinkler system will activate the building’s fire alarm control panel, causing audible alarms in the building, annunciation of the fire’s location on a display, and automatic notification of the site’s emergency responders and the local fire department. Within about the next minute, an additional three to four sprinklers will likely operate over the fire, resulting in discharge of 750 to 1,000 gpm (or even more, depending on the system’s design). This is the equivalent of a master stream device operating on the fire in the building within the first few minutes of ignition.

Early stages of fire development prior to the first sprinkler opening.

Early stages of fire development prior to the first sprinkler opening.

(1, 2)Early stages of fire development prior to the first sprinkler opening. (Photos courtesy of FM Global.)

Human Response to the Fire

Up to this point, the response to the fire has been automatic and mechanical—the building’s fixed fire suppression systems. Once the alarm has been sounded, the human factor enters the equation with the response of the site’s emergency organization and the local fire service agency. Actions taken by these personnel can have a significant effect on the fire’s outcome.

The first concern is for the life safety of the building’s occupants. Depending on the time of day, operating schedules, and so on, the number of persons expected to be in one of these buildings can vary considerably. The sheer size of the building and the large number of potential exits make accounting for all occupants of the building very difficult.

Smoke conditions inside the building may make a search nearly impossible; there will be little layering of smoke, as is experienced in a typical residential fire. Using thermal imaging cameras (TICs) may be necessary to search for and locate the fire. Additionally, use search ropes for the safety of firefighters. Mustering points as well as a good accountability team as part of the site’s emergency organization will also help ensure that all are accounted for. Because of the huge volume of these buildings and the quick response of the fixed fire suppression systems, the interior environment will be smoky but will likely not be oxygen deficient.

The single most important step that you can take to ensure occupant survivability and protection of the structure and contents is to maintain the water supply to the sprinkler system that is keeping the fire in check. Loss of water to the sprinklers, even if for only a brief period before the fire is completely extinguished, can result in rapid fire growth, endangering occupants, firefighters, and the building.

Preplan Collaborations

A good preplan for a high-challenge site needs to be a joint effort between the site’s management and the fire department. When each side listens to the other’s ideas and concerns, the plan will hopefully meet everyone’s objectives. The site personnel are vastly more familiar with the layout, building features, and fire protection equipment than the firefighters who may visit once a year for a preplan.

Some items to address in a good preplan include the following:

  1. Occupant accountability. How will the site’s occupants be accounted for and how will this information be transferred to the incident commander (IC)? Inevitably, there will be parties who cannot be accounted for in the early stages of the incident. How will you organize a search to ensure that the building is clear? It may be good to use a TIC to scan the aisles between rack structures.
  2. Fire location. How will you determine the location of the fire? It is very difficult to locate the seat of the fire in a building with a large footprint that is fully charged with smoke. Are building layouts available that show the fire alarm zones? If so, the zones showing sprinkler water flow will lead to the seat of the fire. Again, using a TIC may prove invaluable in locating the fire. A fire that proves difficult to find is a good sign that the sprinklers have it in check.
  3. Establish control of the sprinkler systems in the fire area. Designate a responder to go to the sprinkler riser or risers to the fire area and ensure that the valves are open and will remain open until ordered closed by the IC. If possible, assign a firefighter and site emergency responder to this function. Confusion at fire scenes has resulted in sprinklers being shut down prematurely, with disastrous results. The order to shut down sprinklers must come from the IC.
  4. Fire pump operation. Assign personnel to monitor the operation of any fire pumps, reporting their satisfactory operation and any observed problems during the course of the incident. Also, assign site personnel who are familiar with the pump’s operation.
  5. Fire department connection. Assign an engine company the position to supply the pumper connection. What water source will be used and at what pump discharge pressure?
  6. Electrical power. Will it be necessary to shut down building power? If so, these large, windowless buildings will become very dark. How will you disconnect the power? Work with site personnel to plan how best to isolate power, if needed. This item becomes critical if the fire pump is driven by an electric motor. If you shut down power, do it so as not to disable the pump. If the local utility is called to isolate power, it may well disconnect power to the whole site and disable the electric fire pump. The preplan should clearly detail where the pump’s power comes from and how to ensure its operation.
  7. Final extinguishment. Position, staff, and charge hoselines before giving the order to shut down sprinklers. Your preplan should specify if the building is equipped with hose stations and if they will be used or if you need to bring in hoselines from the exterior. In many cases, the size of these buildings makes using exterior feeds for hoselines impractical.

A preincident plan needs to be more than an inventory of equipment and building plans at a protected property; it must contain the specific actions you need to take when there is a fire in the building to ensure that the building’s protection systems are used to the best advantage and to ensure a satisfactory outcome.


JAMES BURNHAM is deputy chief/training officer with the Shelburne (MA) Fire District. Previously, he served with the Greenfield (MA) Fire Department and FM Global as a fire protection engineer and senior engineering specialist-group manager. Burnham is also a registered fire protection engineer for the state of Massachusetts. He has a BS degree in civil engineering and an AS degree in fire protection and safety.

Hand entrapped in rope gripper

Elevator Rescue: Rope Gripper Entrapment

Mike Dragonetti discusses operating safely while around a Rope Gripper and two methods of mitigating an entrapment situation.
Delta explosion

Two Workers Killed, Another Injured in Explosion at Atlanta Delta Air Lines Facility

Two workers were killed and another seriously injured in an explosion Tuesday at a Delta Air Lines maintenance facility near the Atlanta airport.