TRAINING FOR WATERWAY FIRE RESPONSES

TRAINING FOR WATERWAY FIRE RESPONSES

BY CRAIG H. SHELLEY

In a recent article describing the fire that occurred in Tampa Bay,1 it was noted that landing barges from the Army Reserve were activated to transport the necessary resources to attack and suppress the fire. The article further stated that a meaningful attack was delayed until late in the day because of the distance the fireboats had to travel and the (time factor needed for) activation, loading, and deployment of the landing barges. Most fire departments do not normally respond to fires on waterways, but those that do may not possess the equipment needed to fight a fire away from shore. Preplanning and training are needed to better enable fire departments to handle these difficult fires.

In the Port of Hampton Roads, Virginia, approximately 4,000 vessels carrying a wide range of commodities including crude oils, refined petroleum products, chemicals, and other flammable and combustible products pass through annually. This volume of shipping and the close proximity of anchored vessels to the major shipping channels within the port present the potential for a major maritime disaster. With no dedicated fireboat available to the Port of Hampton Roads, alternative methods of getting personnel, equipment, and a water supply to a ship or barge on fire in the anchorage or shipping channels have been ad-dressed by the Port of Hampton Roads, the Hampton Roads Maritime Association, and local fire departments.

The above agencies host the Hampton Roads Marine Firefighting Symposium annually. During this week-long event, various topics–including the following–relating to marine firefighting are presented:

U.S. Coast Guard operations and responsibilities at maritime fires and emergencies.

Safety considerations for firefighting personnel when operating at marine fires and emergencies.

Marine terms and vessel construction.

Marine terminal operations.

Tug and barge operations.

Fishing vessel fires.

Firefighting equipment that is unique to marine fires.

Shipboard firefighting systems.

Setting up an incident command system for effective shipboard firefighting.

Activating portable landing barges from the Army Reserve and dewatering operations.

Shipboard firefighting tactics including hands-on training at the U.S. Navy Firefighting School in Norfolk, Virginia.

At the end of the classroom portion of the symposium, attendees are able to participate in two exercises designed to allow the students to test their knowledge and skills at basic shipboard firefighting.

EXERCISE 1

During the first exercise, the participants have to set up an incident command system and establish water supply on a ship at anchorage with no operable onboard firefighting systems.

To accomplish this, the students use a portable fire pump of 3,000-gpm capacity, which is placed onboard a commercial tug (see sidebar). All personnel and equipment must also be loaded on the tug or military landing craft assigned to the U.S. Reserve Fleet. The goal of this exercise is to establish an incident command system, with particular attention given to accountability of personnel, and place into operation three handlines on the main deck of the designated vessel. In past years, a fire department pumper onboard a landing craft has also been used to supply water for this exercise. This year, effective streams were flowing from three handlines within 45 minutes from the time personnel began loading equipment on the landing craft.

EXERCISE 2

The second hands-on exercise simulates an engine room fire in a ship berthed alongside a marine terminal. Once again, an incident command system that stresses personnel accountability is established. Students are divided into engine and ladder companies and must locate the seat of the fire, stretch two handlines to the location, and simulate an attack. After the final exercise, the week`s course is critiqued so that improvements can be incorporated into next year`s symposium.

LESSONS REINFORCED

Team building. Since many agencies were represented at the symposium and close teamwork was necessary to perform the evolutions, an “engine-company” concept was developed the first day. Participants were assigned to engine companies and an officer was designated. The officer does not necessarily have to be a fire department officer or a member of the fire service. These officers are responsible for their team for the entire week, including obtaining lunch for team members.

At the beginning of each day, all officers present a personnel accountability report for their assigned members. Each team sits together during class sessions. Another personnel accountability report is taken after lunch as well as at other times the staff thinks it is needed. Teaming students enables the attendees to work more effectively as a group and provides leadership skills for those not currently in a leadership position.

During the engine room exercise, the instructors simulated a missing-member scenario. One of the team members advancing the handline to the engine room was removed from his group. As a result of the strong team spirit developed during the week, the other members of his company immediately noticed that he was missing and radioed the accountability officer at the entrance to the engine room. After confirming that the member had not exited the engine room, the incident commander was notified and the rapid intervention team was sent in to locate the missing member. The search was successful in a short period of time. The staff believes that the team building accomplished during the week enabled the rescue operation to be initiated quickly.

Pairing of engine companies. With the long and arduous stretches needed onboard large vessels, engine companies should be paired so that enough staffing is present on each handline–to eliminate kinking and ensure that enough hose is at the point of operation. Additionally, hoselines should be stretched up the outside of the ship, where possible, using ropes. Hose rollers would be helpful at deck level to prevent kinking. Do not allow hoselines to remain on aerial ladders or use tower ladders as standpipes. The hose will severely limit moving these ladders should it be necessary to do so.

Accountability. For symposiums such as this where exercises are conducted, an accountability system should be in place from Day 1. It would be helpful to nonfire service personnel if one of the first teaching sessions covered the accountability system to be used. Written materials should also be distributed at this time.

Equipment movement. Firefighting gear including personal protective equipment should be placed in large canvas (or other suitable material) bags and then hoisted onboard the vessel, using rope. If you have ever tried boarding a ship underway or in the anchorage using the ship`s boarding ladder, you know that even without heavy turnout clothing, this is difficult. Members boarding vessels at points other than a pier should wear Coast Guard-approved personal flotation devices. It may be possible to use the vessel`s cranes or a crane at the pier when large amounts of equipment need to be hoisted onboard a ship, especially when additional air cylinders or large quantities of foam are needed.

Staging. In addition to onshore staging areas, an onboard area may be needed. Doing this reduces the reaction time from the operations chief`s request for resources to the time of their arrival and reduces the fatigue of relieving or additional firefighting units.

Rehabilitation. Consider establishing a rehab sector onboard the vessel. An onboard sector will enable rehabilitated firefighters returning to the operations area to report directly to a forward-staging area closer to the fire, if one has been established. At the final exercise, a rehab sector was established on the deck of the ship, and members had to be rehabilitated prior to firefighting activities because of the heat. They had just finished bringing all the equipment and hoses on deck.

Nonpotable water. Companies operating firefighting hoselines and appliances must be informed when nonpotable water is being supplied. All hoselines, appliances, and equipment must be flushed with fresh water before being placed back in service. This policy prolongs the life of the equipment.

* * *

Each year attendance at the symposium grows, and new topics are included. A symposium such as this is a must for fire department personnel who may be called to fight a marine fire or respond to a marine emergency. In addition, a marine firefighting contingency plan should be developed in conjunction with the U.S. Coast Guard to ensure a coordinated response to maritime incidents and promote a mutual understanding in an area where the cooperation of numerous and diverse parties often is essential. n

Endnote

1. Knight, J. G. “Fire in the Bay: Incident Emergency Management System at Work,” Fire Engineering, August 1996, 119-123.



(Left) Students participate in the Navy`s shipboard firefighting school. (Right) Incident command was established at both exercises. Here, the Norfolk Fire Department van is used as the command center.





(Top left) Portable pump supplying line to ship at anchorage. (Top right) Equipment is hauled onboard ship. (Bottom left) Accountability officer adjusts control board as personnel enter or exit the ship. (Bottom right) Three lines flow water from the ship`s deck.


Because the pier is narrow, tools and equipment are removed from the apparatus and placed on skids. Forklifts transfer the equipment to a staging area alongside the ship.

PORTABLE PUMP

The Virginia Port Authority placed this portable three-ton pump in service in 1995. Built by the Hale Fire Pump Company and driven by a Detroit Diesel 8V92TA, V8 cylinder, turbocharged after cooled, diesel engine, it has a 3,000-gpm capacity at 150 psi and a 1,500-gpm capacity at 250 psi. Its estimated cost was $90,000.

The pump is placed aboard any floating platform such as a tugboat or barge. It can also be transported by trailer to a fire onboard a ship at a pier, where it can draft and supply lines to the ship.


Final hookups are made to the portable pump onboard the commercial tug.

CRAIG H. SHELLEY is a battalion chief and 24-year veteran of the fire service, presently serving as the chief of marine operations for the City of New York (NY) Fire Department. He is a task force leader with the FEMA USAR Task Force 1 and a member of the New York City Fire Chiefs Association.

Hand entrapped in rope gripper

Elevator Rescue: Rope Gripper Entrapment

Mike Dragonetti discusses operating safely while around a Rope Gripper and two methods of mitigating an entrapment situation.
Delta explosion

Two Workers Killed, Another Injured in Explosion at Atlanta Delta Air Lines Facility

Two workers were killed and another seriously injured in an explosion Tuesday at a Delta Air Lines maintenance facility near the Atlanta airport.